Skip to Content

← Gridflow

Gridflow · Validation

One model, validated three times

From reliable data to validated grid results

Gridflow combines network data, energy market data and our own project database in a single electricity grid model. Every simulation goes through checks on input quality, model integrity and output.

The most important test is reality: we backtest Gridflow on historical years and compare the simulated energy flows and congestion with actual measured results.

Three validation moments

1 - Input

TenneT data, ENTSO-E, national energy statistics and Voltho's database of realised and announced projects.

2 - Model health

Physical consistency. Bus & zone checks. Infeasibilities. Run checks.

3 - Output

Backtesting against reality. Generation, demand, interconnection.

Built on the best available data sources

Gridflow combines European system data, national grid data and proprietary project data. For each component, we use and compare the most suitable available sources.

ENTSO-E as a data source for European electricity market data in Gridflow

Systeem & markt

National statistics and market data

TenneT TSO logo, data source for the Dutch and German transmission grid

Network & topology

Transmission System Operators

Voltho Intelligence database of battery, generation and flexibility projects

Flexibility, generation and demand assets

Voltho Intelligence

JAO logo, data source for interconnection capacity between European countries

Cross-border power

Interconnection

Input

We model the electricity grid per country, per substation and per circuit.

Output

We backtest our model by comparing historical generation and demand with simulations at annual, monthly, daily and hourly level. This is the crucial step for every future scenario simulation.

Validation: renewable generation simulated by Gridflow versus actual measured generation

The strongest validation takes place on the output: can Gridflow reproduce historical reality?

Backtest of simulated solar generation against historical measurement dataHourly validation of Gridflow solar generation in the Netherlands

Benchmarking simultaneity per generator

Trusted by

Vopak
Van Hooft
Equans
Energy Storage NL
CBS
Zeppelin CAT
Endress+Hauser
Electricity Campus
Novar
Helin
Gemeente Rotterdam
De Tinfabriek
Vopak
Van Hooft
Equans
Energy Storage NL
CBS
Zeppelin CAT
Endress+Hauser
Electricity Campus
Novar
Helin
Gemeente Rotterdam
De Tinfabriek

Want to know more about the Gridflow methodology?

Contact us today to deepen your insight