From question to executable result.

A selection of completed projects on grid congestion, batteries, charging infrastructure and the decarbonisation of fleets and heat.

Grid congestion solution and EMS test facility for the Elektriciteitscampus

Real estate · Arnhem · 2025

Grid congestion solution and EMS test facility for the Elektriciteitscampus

The Elektriciteitscampus in Arnhem is developing a test facility for energy management systems (EMS) and is dealing with grid congestion.

What we did

  • 3.5 MWh battery solution
  • Design strategy for the EMS
  • Guidance through the tender process
ResultA test environment for the EMS, with grid connection, charging infrastructure, solar panels, building functions and market integration of batteries.
Battery for peak shaving and imbalance trading at Protix

Industry · North Brabant · 2024

Battery for peak shaving and imbalance trading at Protix

Protix, an industrial client with solar panels and cooling installations in the Theodorushaven, was dealing with grid congestion.

What we did

  • Flex scan carried out
  • Flexible contract options with Enexis compared
  • Business case for a 2 MWh battery with EMS, for peak shaving and trading on the spot and imbalance markets
ResultA carefully substantiated choice for the client.
Electric charging despite grid congestion at Endress+Hauser

Industry · Naarden · 2025

Electric charging despite grid congestion at Endress+Hauser

Endress+Hauser, active internationally in measurement instrumentation, wanted to charge a vehicle fleet during office hours despite grid congestion.

What we did

  • Cost-benefit analysis of battery, AC and DC charging concepts
  • Supplier proposals for batteries, charging infrastructure, solar carports, EMS and installation
  • Applied for subsidies, a new energy contract and two environmental permits
Batteries, CBC, charging infrastructure and energy contract for De Tinfabriek

Commercial real estate · Liander area

Batteries, CBC, charging infrastructure and energy contract for De Tinfabriek

De Tinfabriek wanted to know the options for battery storage, charging infrastructure and flexible transport agreements with Liander.

What we did

  • Options for storage, charging and flexible contracts investigated
  • Solution paths compared and prioritised
ResultThe best route: a flexible contract, subsidies, batteries and a trading strategy.
Business case for electric and hydrogen trucks for Van Hooft Transport

Transport · 2025–2035

Business case for electric and hydrogen trucks for Van Hooft Transport

Van Hooft Transport, with a fleet of low-loaders across multiple sites, was looking for the best drivetrain for the next ten years.

What we did

  • Total costs from 2025 to 2035 compared for electric, hydrogen and diesel trucks
  • Strategic advice drawn up
  • Subsidy applied for DC charging infrastructure at multiple sites
Decarbonisation strategy for a European truck fleet

Transport · Europe · 2025–2035

Decarbonisation strategy for a European truck fleet

A logistics carrier operating across Europe was looking for a strategy to decarbonise its truck fleet from 2025 to 2035.

What we did

  • All drivetrain options compared on economic feasibility and emissions of CO2, particulate matter and NOx
  • Financing and subsidy options mapped
ResultThe ideal fleet in 2035: e-trucks with charging stations and solar panels, supplemented with biodiesel. This set the investment strategy.
CO2 capture and batteries for greenhouse horticulture

Greenhouse horticulture · Dordrecht · 2025

CO2 capture and batteries for greenhouse horticulture

A major supplier of combined heat and power (CHP) units wanted to help its greenhouse horticulture clients with the energy transition.

What we did

  • Business case per customer profile for local CO2 capture and batteries
  • Temporarily storing CO2 from the CHP and using it when the crops need it
  • Running the CHP during the day and storing energy when power prices are low
ResultInsight into how attractive both options are for the supplier's clients.

Trusted by

Vopak
Van Hooft
Equans
Energy Storage NL
CBS
Zeppelin CAT
Endress+Hauser
Electricity Campus
Novar
Helin
Gemeente Rotterdam
De Tinfabriek
Vopak
Van Hooft
Equans
Energy Storage NL
CBS
Zeppelin CAT
Endress+Hauser
Electricity Campus
Novar
Helin
Gemeente Rotterdam
De Tinfabriek

Will your project be next on this list?

In a no-obligation conversation, we explore your question and the possible route.